Cast Steel Basket Strainer
Product Description
Product Detail
The Cast Steel Basket Strainer provides full flow with minimal pressure drop.The Cast Steel Basket Strainer features a flange, easy installation and accessibility.The HISPEED® flanged Cast Steel Basket Strainers may be used in commercial and industrial applications,including chemical,biochemistry,pulp&paper,chemical fiber,pharma-ceutical,environmental protection etc.Choose HISPEED® Cast Steel Basket Strainers for the most specified, versatile and economical valve option in commercial, mechanical and industrial applications.We are expecting to become your long term partner in China.Being a result of ours specialty and service consciousness, our corporation has won a very good status amid buyers all over the world for Factory wholesale China Cast Steel/Cast Iron Flanged End Y-Strainers, We welcome shoppers, enterprise associations and mates from all sections of your environment to call us and seek out cooperation for mutual advantages. Factory wholesale China Strainers, Cast Steel Y-Strainers, We warmly welcome domestic and overseas customers to visit our company and have business talk. Our company always insists on the principle of "good quality, reasonable price, the first-class service". We are willing to build long-term, friendly and mutually beneficial cooperation with you.
Product Parameter (Specification)
DIMENSIONS(mm) Class150
NPS |
DN |
L |
D |
D1 |
D2 |
b |
n-d |
H |
H1 |
T(NPT) |
W.T(Kg) |
2 |
50 |
215.9 |
152 |
120.7 |
92 |
15.9 |
4-19 |
108 |
138 |
1/2 |
16 |
2.5 |
65 |
206.4 |
178 |
139.7 |
105 |
17.5 |
4-19 |
121 |
140 |
3/4 |
16 |
3 |
80 |
222.3 |
190 |
152.4 |
127 |
19.1 |
4-19 |
140 |
149 |
3/4 |
21 |
4 |
100 |
292 |
229 |
190.5 |
157 |
23.9 |
8-19 |
152 |
200 |
1 |
32 |
5 |
125 |
311.2 |
254 |
215.9 |
186 |
23.9 |
8-22 |
143 |
260 |
1 |
49 |
6 |
150 |
352.4 |
279 |
241.3 |
216 |
25.4 |
8-22 |
170 |
318 |
1 1/4 |
76 |
8 |
200 |
441.3 |
343 |
298.5 |
270 |
28.5 |
8-22 |
203 |
384 |
1 1/2 |
106 |
10 |
250 |
549.3 |
406 |
362 |
324 |
30.2 |
12-25 |
264 |
406 |
1 1/2 |
182 |
12 |
300 |
635 |
483 |
431.8 |
381 |
31.8 |
12-25 |
314 |
603 |
2 |
313 |
14 |
350 |
1197 |
533 |
476.3 |
413 |
35 |
12-29 |
513 |
873 |
2 |
- |
16 |
400 |
1197 |
597 |
539.8 |
470 |
36.6 |
16-29 |
513 |
873 |
2 |
- |
DIMENSIONS(mm) Class300
NPS |
DN |
L |
D |
D1 |
D2 |
b |
n-d |
H |
H1 |
T(NPT) |
W.T(Kg) |
2 |
50 |
215.9 |
165 |
127 |
92 |
22.2 |
8-19 |
108 |
138 |
1/2 |
16 |
2.5 |
65 |
220.7 |
190 |
149.2 |
105 |
25.4 |
8-22 |
121 |
140 |
3/4 |
18 |
3 |
80 |
242.9 |
210 |
168.3 |
127 |
28.6 |
8-22 |
140 |
149 |
3/4 |
25 |
4 |
100 |
298.5 |
254 |
200 |
157 |
31.8 |
8-22 |
152 |
200 |
1 |
39 |
5 |
125 |
333.4 |
279 |
235 |
186 |
34.9 |
8-22 |
143 |
260 |
1 |
55 |
6 |
150 |
374.7 |
318 |
269.9 |
216 |
36.5 |
12-22 |
170 |
318 |
1 1/4 |
89 |
8 |
200 |
460.4 |
381 |
330.2 |
270 |
41.3 |
12-25 |
203 |
384 |
1 1/2 |
132 |
10 |
250 |
581 |
445 |
387.3 |
324 |
47.6 |
16-29 |
264 |
406 |
1 1/2 |
208 |
12 |
300 |
644.5 |
521 |
450.8 |
381 |
50.8 |
16-32 |
314 |
603 |
2 |
358 |
14 |
350 |
1197 |
584 |
514.3 |
413 |
54.0 |
20-32 |
513 |
873 |
2 |
- |
16 |
400 |
1197 |
648 |
571.9 |
470 |
57.2 |
20-35 |
513 |
873 |
2 |
- |
Product Feature And Application
Basic Design:ASME B16.34
Face to Face Dimensions:Manufactory Standard
End Flange Dimensions:ASME B16.5
Butt Welding End:ASME B16.25
Inspection and Test:ASME B16.34
Materials:ASTM
Product Details
PART NAME |
MATERIAL |
|||
CARBON STEEL |
STAINLESS STEEL |
HIGH-TEMPERATURE STEEL |
||
BODY |
ASTM A216 WCB |
ASTM A351 CF8 |
ASTM A351 CF8M |
ASTM A217 WC6 |
SCREEN |
304 |
304 |
316 |
304 |
GASKET |
304+GRAPHITE |
304+GRAPHITE |
316+GRAPHITE |
304+GRAPHITE |
COVER |
ASTM A216 WCB |
ASTM A351 CF8 |
ASTM A351 CF8M |
ASTM A217 WC6 |
STUD |
ASTM A193 B7 |
ASTM A193 B8 |
ASTM A193 B8 |
ASTM A193 B16 |
NUT |
ASTM A194 2H |
ASTM A194 8 |
ASTM A194 8 |
ASTM A194 4 |
PLUG |
A105 |
304 |
316 |
304 |
Deliver,Shipping And Serving
Ship from Qingdao or another Seaports
FAQ
|
Q |
A |
1 |
How many days you need to install the equipment? |
Unwanted. |
2 |
How many staff abroad you sent to install the equipment? |
Unwanted. |
3 |
Can I transfer the money to you then you pay to other supplier? |
YES. |
4 |
Can I delivery the goods from other supplier to your factory? Then load together? |
YES. |
5 |
When will you leave your factory and to have your spring festival holidays? |
According to national regulations. |
6 |
Can the equipment be installed under hot weather? |
YES. |
7 |
Can Your products be installed under the cold weather? |
YES. |
8 |
Do You have office in shanghai or guangzhou that i can visit? |
NONE. |
9 |
Can you send your staff to install the equipment for us? |
Unwanted. |
10 |
Can I only buy some spare parts from you? |
YES. |
11 |
Will you will attend the fair to show your products? |
YES. |
12 |
Can you send your equipment to my warehouse in guangzhou? |
YES. |
13 |
How long it takes you to provide the designing options for us? |
3 days at most. |
14 |
What is your products standardization? |
AWWA BS AIP WRAS FM. |
15 |
How do you pack the equipment? |
Negotiate with the customer. |
16 |
Can you can design the equipment according to our size? |
YES. |
17 |
How many years have your company made this kind of equipment? |
5 years. |
18 |
Which certificate do you have for your equipment? |
FM. |
19 |
How many staffs do you have in your factory? |
200 |
20 |
Do you have any agent in our country? |
NONE. |
21 |
Do you have any real project pictures of the equipment? |
YES. |
22 |
How far is your factory from the city hotel? |
10 km. |
23 |
How far is your factory from the airport? |
10 km. |
24 |
How long it will take from guangzhou to your factory? |
5 hours. |
25 |
Where is your factory located? |
Weifang City,Shandong province. |
26 |
Do you provide free spare parts? |
It depends. |
27 |
What is the age range for your products? |
Everyone. |
28 |
Do you have detailed and professional installation manual? |
YES. |
29 |
If OEM is acceptable? |
YES. |
30 |
Do you provide sample? Free or charge? |
It depends. |
31 |
What is your term of payment? |
30% payment in advance, 70% paid before shipment. |
32 |
What is your MOQ? |
One container. |
33 |
Are you a trading company or a manufacturer? |
Trade and Industry combination group company. |
34 |
How long is your delivery time? |
25-40 days. |